NEW - Construction / Enhancement Project

Hello to all our guests!

June 9, 2014.  We recently received notice of a large enhancement project that will be taking place over the next few months at the NOW Larimar Punta Cana and their sister resort next door Secrets Royal Beach Punta Cana, starting in early June. This project will undoubtedly enhance the vacation experience for future guests staying at both resorts.

Main Lobby: 
  • Newly painted walls in the lobby area and new furnishings such as chairs, sofas, curtains, pillows, lamps and contemporary décor
  • Redesigned Moments Lobby Bar, including elegant décor and furnishings:
Preferred Club: 
  • Addition of 80 rooms to the Preferred Club room inventory, which includes the rebranding of 80 standard room categories
  • Expansion and redesign of the Preferred Club Lounge, including new décor and furnishings
  • Rebranding of the “Relax pool” to become a Preferred Club pool, with the addition of a pool bar (construction starting September 1st)
Beach Area: 
  • New Water Sports Center and Barefoot Grill, which will be connected and located in front of the 
  • Preferred Club pool
  • New restroom facilities on the beach redesigned
Restaurants - The following restaurants have been redesigned:
  • Mercure Restaurant: New sophisticated European décor and furnishings.
  • Tamarindo Restaurant: Completely rebranded with authentic, colorful design and furnishings.
  • Carnival Restaurant: Given a fresh new look with stylish European décor and furnishings, including lamps that were crafted by Dominican artisans.
  • Castaways Restaurant: New, colorful ambiance and décor.
  • Spice Restaurant: Graced with new Asian-inspired décor.
Convention Center: 
  • New carpeting and panels, as well as a new storage room
During this construction period for the new Preferred Club rooms at NOW Larimar and for the new Seaside Grill at Secrets Royal Beach, nearby room areas may be closed to avoid disturbances. Any guests affected by this closure will be accommodated. There will be a minimal visual and noise impact for guests in all other construction areas during this time. We anticipate that these renovations will not be completed until the fall season, however, we will provide an estimated time of completion for this project in the near future.

No comments:

Post a Comment